Presenting three options instead of one number raises your average ticket without a single pushy sales line. Contractors who use tiered proposals, also called good-better-best pricing, routinely see 20 to 40 percent more customers choose a mid or upper tier than they expected. The reason is simple: when a customer sees only one price, they decide yes or no. When they see three, they decide which one.
Key takeaways
- A single-number proposal forces a yes-or-no decision. Three tiers shift the customer's choice to "which one," and most people land on the middle option.
- The "Best" tier exists partly as an anchor. It makes "Better" feel reasonable by comparison, which is where you want most customers anyway.
- Each tier should solve a real problem at a real price point, not be artificially padded. Customers can smell a fake upgrade.
- Tiered proposals work in every trade: electrical, plumbing, HVAC, remodeling, and landscaping all have natural upgrade paths already built into the work.
- You do not need special software to start. A clean three-column table in any proposal template gets you there today.
What is a tiered proposal and why does it work?
A tiered proposal is a written estimate that presents three defined scopes of work at three price points, typically labeled Good, Better, and Best (or Standard, Enhanced, and Premium if you prefer). Each tier is a complete, legitimate option. None of them is a throwaway.
The psychology behind this is called anchoring. When customers see your top-tier price first, every other number feels more affordable by comparison. Most buyers default to the middle option because it feels like the rational, value-conscious choice. Sales researchers call this the "compromise effect," and it shows up consistently across industries. You are not manipulating anyone. You are organizing information in a way that mirrors how people actually make decisions.
The contractor who sends one price is doing the customer's job for them, pre-qualifying the work and leaving money on the table at the same time.
What do you need before you build your first tiered proposal?

Think of these as your materials before you start the build.
A clear scope baseline. Know what the minimum acceptable job looks like. This becomes your Good tier. It solves the customer's core problem, meets code, and is something you would stand behind.
Two upgrade paths. These should be real improvements, not inflated labor or markups disguised as value. Think longer warranties, better equipment, more durable materials, or additional scope that makes the job last longer or look better.
Your fully loaded costs for each tier. Material, labor, overhead, and margin. If you do not know your numbers at each level, you cannot price them right. Build each tier as if it were a standalone job.
A clean way to present it. A printed sheet, a PDF, or a proposal app. The format matters less than the clarity. Each tier should be readable in under 60 seconds.
How to structure each tier: step by step

Step 1. Build your Good tier first
The Good tier is your floor, not your throwaway. It covers the job adequately, meets code, and is priced to make money. If you would be embarrassed to do this scope of work, it does not belong in a proposal.
Example, HVAC replacement: Good tier is a 14 SEER2 single-stage unit, standard filter, basic thermostat, and one-year parts and labor warranty. Installed price: $5,800.
Example, bathroom remodel: Good tier is a standard builder-grade vanity, fiberglass tub surround, new toilet, and basic tile floor. Total: $9,400.
Price the Good tier to win a customer who is genuinely budget-constrained. You still make margin. You still do good work.
Step 2. Build your Best tier next
Build Best before Better. This is intentional. Best represents the full version of the job done right, and it sets your anchor. Price it honestly for what it costs to deliver, with your full margin built in.
HVAC example: Best tier is an 18 SEER2 two-stage variable-speed system, smart thermostat, whole-home air filtration, and a ten-year parts and labor agreement. Installed: $11,200.
Bathroom example: Best tier uses a semi-custom vanity, full subway tile surround, curbless shower with a linear drain, heated floor, and a premium toilet. Total: $19,800.
A customer seeing $11,200 first will find $7,400 (your Better tier, built next) much easier to say yes to.
Step 3. Build your Better tier to land in the middle
Better is where you want most customers to end up. It should represent a genuine step up from Good and solve a real pain point the Good tier leaves unaddressed: a longer warranty, better efficiency, materials that last 20 years instead of 10.
HVAC example: Better tier is a 16 SEER2 two-stage unit, smart thermostat, UV air purifier, and a five-year parts and labor warranty. Installed: $7,400.
Bathroom example: Better tier is a mid-grade vanity, full ceramic tile surround and floor, a soaking tub or walk-in shower, and an upgraded toilet. Total: $14,200.
The gap between Good and Better should feel worth crossing. The gap between Better and Best should feel like a stretch. That spread gets you the middle choice most of the time.
Step 4. Frame the tiers in writing without editorializing
Let the scope and price do the talking. Do not label tiers with loaded words like "cheapest" or "most popular." State what each tier includes. If something is not included in Good that is included in Better, say so plainly. "Does not include a smart thermostat" is more honest than vague language like "basic controls."
A simple table format works well here:
| Good | Better | Best | |
|---|---|---|---|
| Equipment | 14 SEER2 single-stage | 16 SEER2 two-stage | 18 SEER2 variable-speed |
| Thermostat | Standard | Smart | Smart + zoning |
| Air quality | None | UV purifier | Full filtration system |
| Warranty | 1 yr parts + labor | 5 yr parts + labor | 10 yr parts + labor |
| Installed price | $5,800 | $7,400 | $11,200 |
The customer reads this and makes their own call. You are not selling. You are informing.
Step 5. Present the tiers in person or walk them through in your proposal notes
If you are presenting face to face, mention all three options without steering. Say something like: "Here are three ways we can do this job. Each one solves your problem. They differ in equipment quality, warranty coverage, and long-term operating cost." Then stop talking.
If you are sending a written proposal, add a brief note under each tier explaining the main reason someone would choose it. One sentence is enough. "Good for customers replacing like-for-like on a tight timeline." "Better for homeowners planning to stay 10-plus years." "Best for customers who want to set it and forget it."
Real trade examples across different scopes
Electrical panel upgrade. Good: 200-amp panel swap, same location, code-compliant breakers, $2,800. Better: 200-amp upgrade with arc-fault breakers throughout, surge protection, $3,600. Best: 200-amp upgrade, full arc-fault protection, whole-home surge protection, EV-ready circuit, $4,800.
Water heater replacement, plumbing. Good: 40-gallon gas tank water heater, standard install, six-year warranty, $1,100. Better: 50-gallon high-efficiency tank, expansion tank, ten-year warranty, $1,650. Best: tankless on-demand unit, updated gas line, isolation valves, fifteen-year heat exchanger warranty, $3,200.
Deck build, general contracting. Good: pressure-treated pine deck, standard railing, $12,000. Better: composite decking, aluminum railing, $18,500. Best: composite decking, cable railing, built-in bench seating, LED post lighting, $24,000.
In every case, the Good tier is real work done right. The pricing is transparent. The upgrades solve genuine problems.
Tips that make tiered proposals work better
- Lead with the Best tier visually. Put it on the left or at the top. Anchoring works top-to-bottom and left-to-right.
- Keep the gap between Good and Better proportional. A jump from $3,000 to $12,000 reads as artificial. Aim for 25 to 40 percent between each step.
- Never apologize for the Best tier. If a customer asks why it costs that much, explain the scope. Do not discount before they ask.
- Track your tier selections. After 20 proposals, you will know which tier most customers pick. That data tells you whether your pricing and framing are working.
- Do not pad the Good tier to make the others look better. Your Good tier is your floor. It still needs to make you money and reflect real value.
Frequently asked questions
What if a customer only wants to see one price?
Some customers will ask for a single number. Give them one, but mention that you have a few options at different price points and offer to walk through them. Most will say yes. If they genuinely want one price, give them your Better tier. It represents the job done right at a price most customers can work with, and it protects your margin.
How many tiers is too many?
Three is the right number. Four or five tiers creates decision fatigue and slows the close. The Good-Better-Best structure maps to how most people think about trade-offs: the bare minimum, the smart choice, and the premium option. Adding a fourth tier usually dilutes the anchor effect.
Do tiered proposals work for commercial work?
Yes, but the framing changes. Commercial customers respond to total cost of ownership, warranty terms, and schedule guarantees more than residential customers do. Label your tiers by outcome rather than quality. "Standard completion," "accelerated schedule with enhanced warranty," and "full turnkey with extended service agreement" land better in a commercial context.
Should I include all three tiers on one page?
Yes. One page, three columns or three clear sections. A customer should be able to compare all three options without scrolling or flipping pages. Splitting tiers across multiple pages breaks the comparison effect and makes your proposal harder to act on.
What do I do if the customer picks the Good tier every time?
First, check whether your Good tier is actually good or just cheap. If customers always pick the bottom, your Better tier may not be offering a compelling enough step-up. Revisit what the Better tier solves that Good does not. A longer warranty, better equipment efficiency, or a material upgrade that extends the life of the job by ten years are all real reasons to upgrade, and they need to be spelled out clearly.
Can I use tiered proposals for service calls, not just project work?
Yes. A diagnostic call can offer three paths forward: a repair, a repair plus maintenance plan, or a full replacement with a service agreement. Even a two-hour service call benefits from showing the customer what their options are rather than handing them one number.
How do I handle a customer who wants to mix tiers, like Best equipment with Good installation?
Draw a clear boundary in your proposal language. State that each tier is a complete scope and that partial selections are available as a custom quote. This keeps your liability clean and prevents scope creep. Most customers who ask are just trying to understand the pricing. Explaining why the tiers are bundled usually closes the question.
Tiered proposals do not require a sales pitch. They require clear thinking about your work, your costs, and the real options available to your customer. Build three honest scopes, price them to make money at every level, and let the structure do the work for you. The contractor who sends one number is guessing at what the customer wants. The contractor who sends three is having a different kind of conversation entirely.
Putting this into practice gets easier when your proposal, invoicing, and follow-up are all in one place. Krue is built for contractors who want to send better proposals from their phone and get paid without chasing it down after the job.



